For Sale – Floating Production Offloading (FPO) Quick
Response Well Spill (25000 BBL/Day)
the system is built with a 3 phase process to separate water from gas/oil. Glycol process heaters provide heat to the process and a chemical injection system introduces anti-foam & demulsifying agents to the system
The barge was never used and all equipment is brand new.
Price: $ 8 million(Negotiable).
Location: USA
Specs
• Lenght Overall : 316′ 6″
• Width (Beam) : 104′ 9″
• Depth: 20′
• Load Line: 15′ 6″
• Design Draft (meters): 5.0703
• LDT: 5,567.62 L tons
• ITC Gross: 8,008 ITC Net: 2,402
• Flag: US
Additional information available upon receipt of EOI to;
CEO, Entek Integrated Resources, 79 Lewis Street, Anchoria House, Lagos Island, Lagos, Nigeria.
For more enquiry call 07052290067, or send an email to contact@entekhub.com
Reviews
There are no reviews yet.