1. Gross tonnage = 60kbpd.
2. Oil = 45k bpd.
3. Gas handling = 35mm scfd.
4. Separation and Stabilization = 3 phase.
5. PW treatment and Evacuation = 42k bpd.
6. Gas Quality- dry, dew point system = 35mm scfd.
7. Metering system-Gas Lact = 35mmscfd, 45bpd.
UTILITIES AND OFF-SITES.
8. Firewater system- Required = TBD.
9. Instrument air and Nitrogen system- Required = TBD.
10. Potable and Service water system- Required = TBD.
11. Main gas Gen and EDG- Required = TBD.
12. Inert gas system- Required = TBD.
13. RVP = 11 PSI.
14. Bs & W = 5%
15. Accommodation = 65 POB(min)
16. Riser Sloth = 10(mm).
17. HULL :
a. Oil cargo tank = 750k bbl (min)
b. Wash and setting tanker = TBD.
c. Drain Tank. = TBD.
d. Methanol, diesel, fresh and potable water, ballast tank = TBD.
18. Mooring system – Turret mooring or speed mooring.
19. Offloading system = Tandem or side by side offloading.
20. Location = Aje Field.
21. Water Depth = 90 to 120m.
Duration: 6 months.
Please kindly send the full specs and Q88, pictures of the FPSO and daily rate and location for us to come over and Inspect.